PROJECT CLASSIFICATION:PN-CLASS CONTAINMENT TRIALS
OVERSIGHT AUTHORITY:JOINT DEFENSE RESEARCH DIRECTORATE
DISTRIBUTION:RESTRICTED
AUTHORIZED RECIPIENTS:JDRD COMMAND / HELIXX BIOSCIENCES / SPECTRUM LEAD PERSONNEL
SUMMARY:
Project Spectrum objective was containment and controlled stress-response assessment of multiple PN-class subjects.Operation active fifty-nine days without major breach.Incident occurred during advanced extraction trial involving Subject F-8 (female).Intake records confirm Subject F-8 was the only detainee recovered directly from active military service while in a confirmed gravid state.Subject had been undergoing classified stress-resilience conditioning at the time of PN-class manifestation.Detection occurred during internal monitoring review of anomalous biometric output.Subject was transferred to SPECTRUM containment under expedited authority.No comparable cases recorded within program intake.
Pre-incident observations indicated measurable correlation between applied stress exposure and amplified PN-class output.Those subjected to sustained stimulus conditions demonstrated progressive increases in electromagnetic discharge, atmospheric reactivity and physiological resilience.Amplification effect cumulative.No plateau observed within testing window.
Personnel assigned to long-duration containment rotations reported intermittent cognitive lapses beginning approximately Day 31.Symptoms included short-term memory discontinuity, temporal disorientation, and failure to recall completed procedural steps.Medical screening found no infectious or toxicological cause.
Incidence rate increased in proximity to high-yield subjects.
Subject F-8 recorded highest amplification index of all SPECTRUM detainees.Subject was also the only intake confirmed gravid (estimated 18–20 weeks gestation) at time of containment, resulting in prioritised observation cycles and extended stimulus evaluation.Physiological data suggests gestational status may have influenced amplification threshold, though correlation remains unconfirmed.
INCIDENT:
At 02:00 hours extraction protocol initiated under laboratory supervision.Subject F-8 exhibited elevated biometrics exceeding previously recorded thresholds.Telemetry escalation coincided directly with onset of environmental destabilisation.Restraint compliance maintained for seventeen seconds.Environmental conditions destabilised without external trigger.
Prior to restraint failure, a containment officer initiated an unscheduled abdominal examination against protocol.Subject agitation increased immediately following contact.
Barometric pressure drop registered internally.Static discharge documented across interior surfaces.Audible atmospheric disturbance recorded prior to structural breach.Electrical interference escalated to full systems disruption.Primary lighting failed.Backup grid failed.Communications failed.
Meteorological satellites later confirmed rapid storm cell formation directly above facility coordinates within ninety seconds of onset.No preexisting storm activity detected within regional radius.During blackout interval multiple personnel sustained electrical trauma absent identifiable power source.Witnesses reported vertical light discharge originating above Subject F-8’s position.Discharge vectors remained centred on Subject F-8 throughout the event window.Impact patterns consistent with directed lightning strikes.
Containment integrity lost.All subjects escaped.
NOTE:
Personnel fatalities exhibited atypical trauma profiles inconsistent with known electrical or blast injury models.Documented presentations included rapid ocular rupture, internal thermal degradation absent external burn patterning, and structural tissue liquefaction without corresponding surface damage.Metallic objects in contact with affected personnel displayed localized magnetisation and fusion.
Lachlan reads it again and again and again.
His eyes catch on the line,internal thermal degradation absent external burn patterningbecause he knows exactly what that means.Insides melted without an entry or exit point for the electricity.
What had Fenwick told him?
I was there for Project Spectrum.I was there when the storm hit.I carried my man out when that bitch fried his eyeballs, when she melted everyone from the inside out to get away.It starts with a storm.They call it to them, like witches.
She.
Lachlan searches through his current document for more information about F-8 but finds most of it redacted with only a few references to other subjects listed as either M or F with numbers attached, standard for a holding site, which is what this is, no doubt about it.
Atrocities were committed here.
The language makes it plain.
He touches his inner earpiece.‘Danya, come in.’
‘Eight bells,Danya here.’
‘Eight bells.Need you and Zaitsev ASAP.’
‘Heard.’